San Diego County Regulations & Zoning

San Diego County, spanning coastal urban hubs, inland valleys, and expansive rural backcountry in Southern California’s southwestern corner, features a dual zoning framework: the County of San Diego directly oversees land use and ADU regulations in its unincorporated areas (home to communities like Fallbrook, Valley Center, and Spring Valley), while 18 incorporated cities—including the City of San Diego—administer their own rules within city limits, all subject to California’s statewide ADU laws that prioritize housing production.

Key Facts Snapshot (Updated March 2026)

Topic San Diego County (Unincorporated) City of San Diego (City Limits)
Regulating Authority

County Planning & Development Services (PDS) for unincorporated areas only.

City Development Services per San Diego Municipal Code & Info Bulletin 400 (Jan 2026).

ADU Eligibility

Residentially zoned lots with existing or proposed single-family dwelling (SFD).

Zones permitting residential uses; check ZAPP portal.

Number Allowed (Single-Family)

1 ADU + 1 JADU (multifamily: conversions ≤25% + up to 2 detached; pending amendment may allow up to 8 detached per state law).

Base: 1 ADU (attached/detached/conversion) + 1 JADU; plus density bonus program (lot-size caps, e.g., up to 4–6 total).

Max Size

Detached: 1,200 sq ft; Attached: 50% of SFD or 1,200 sq ft max (exceptions for smaller units); JADU: 500 sq ft.

ADU: 1,200 sq ft max (min 150 sq ft); JADU: 500 sq ft.

Setbacks

New ADUs: 4 ft side/rear (plus fire); front per zone; conversions keep existing.

Conversions: existing; New: min 4 ft side/rear (especially >16 ft height or fire hazard zones); front per zone or 4 ft min.

Parking

1 space per ADU (tandem/driveway OK); exemptions for transit (½ mile), historic districts; no replacement for garage conversions.

No parking required outside Coastal Overlay Zone; limited requirements in specific Beach Impact Areas with exemptions.

Owner-Occupancy

Not required for ADUs (state law); required for JADUs (owner in primary or JADU if shared sanitation).

Not required for ADUs; required for JADUs (with exceptions).

Rental / Short-Term

No rentals <30 days.

ADUs: no lease <31 days; JADUs: >30 days, no short-term residential occupancy.

Permitting Timeline

60 days ministerial after complete application (statewide).

60 days ministerial (statewide); Coastal Development Permit may apply in overlay.

Fees / Impact

Impact fees exempt <750 sq ft; proportionate above; prior waiver program ended Jan 2024.

Per City fee schedule; state limits apply.

Upcoming Changes

Board of Supervisors hearing March 4, 2026 on ordinance amendment (clarifications, multifamily increases, separate sale program per AB 1033).

Some density bonus & other updates pending full Coastal Commission certification.

Rent Rates In San Diego County

ZIP CITY NEIGHBORHOOD 1BR 2BR 3BR 4BR
91901 ~ 92145 San Diego County Citywide $2,192 $3,308 $4,616 $6,470

FAQs: San Diego County ADU Requirements, Laws & Guidelines (2026)

What are the San Diego County ADU requirements for properties in unincorporated areas?

San Diego County ADU requirements allow one ADU and one JADU on residentially zoned lots with an existing or proposed single-family dwelling in unincorporated areas, following objective standards that align with state law for size, setbacks, and parking.
• Properties must be confirmed unincorporated via the County map or Property Summary Report using your APN.
• Multifamily properties qualify for conversions of non-habitable space (up to 25% of units) plus detached ADUs.
• A building permit is always required; pre-approved County plans can speed the process.

Official sources:
https://www.sandiegocounty.gov/pds/bldg/adu.html
https://www.sandiegocounty.gov/content/dam/sdc/pds/zoning/formfields/PDS-PLN-611.pdf

Pro tips

If you convert a garage to an ADU in Coronado, the code requires replacement parking, but replacement spaces may be covered or uncovered.